Here are several thousands worth of words in picture form from our last, thankfully, painting day in the main rooms until touch-ups before opening! We still need 2 more coats in the theatre.
Masking went well, despite the numerous "ribs" along the asbestos concrete walls. There was no dripping, and only very little overage, which will be easily touched up closer to the end of the "space preparation" phase of the project.
No complex masking/painting job should be undertaken without a good level, square, wide painter's tape and quality paint and brushes. Also, invest in small rollers to get the job done as they produce cleaner results with no brush strokes.
Our "falling wall" at the end of the exhibition before entering the theater.
11.12.08
Painting V
Posted by Eric Espig at 22:15 0 comments
Labels: brushing, cutting-in, masking, painting, rolling
Subscribe to:
Posts (Atom)